APAR status
Closed as program error.
Error description
Each time the edit button of the BP Schema Configuration is selected, the Output and/or Input Root Element must be re-selected and saved, even if the intent is not to modify these particular fields. If the proper values are not re-selected and saved, incorrect values will be attached.
Local fix
Circumvention: Edit the Output and/or Input Root Element and resave on each subsequent edit.
Problem summary
Users Affected: All Problem Description: When a user edits an existing BP Schema Mapping, both the input and output root elements are not showing the values that were previously selected. Platforms Affected: All
Problem conclusion
Resolution Summary: A code fix has been provided. Delivered In: 5020601
Temporary fix
Comments
APAR Information
APAR number
IT12269
Reported component name
STR B2B INTEGRA
Reported component ID
5725D0600
Reported release
525
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt
Submitted date
2015-11-13
Closed date
2015-11-23
Last modified date
2015-12-18
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Fix information
Fixed component name
STR B2B INTEGRA
Fixed component ID
5725D0600
Applicable component levels
R526 PSY
UP
[{"Business Unit":{"code":"BU059","label":"IBM Software w\/o TPS"},"Product":{"code":"SS3JSW","label":"IBM Sterling B2B Integrator"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"5.2.5","Edition":"","Line of Business":{"code":"LOB59","label":"Sustainability Software"}}]
Document Information
Modified date:
18 December 2015