IBM Support

IJ49089: SCHEDULER 7.6.8.2 ROLLING PROJECTS SKIPS DAYS.

Subscribe to this APAR

By subscribing, you receive periodic emails alerting you to the status of the APAR, along with a link to the fix after it becomes available. You can track this item individually or track all items by product.

Notify me when this APAR changes.

Notify me when an APAR for this component changes.

 

APAR status

  • Closed as program error.

Error description

  • STEPS TO REPRODUCE:
    
    1. Create a new scheduler record, add a name for the record, add
    a calendar and a shift place a checkmark in the Rolling Schedule
    field and save the record. Set the start date to 11/3/23 12:15
    AM, End date of 11/17/23 12:15 AM. Save.
    
    
    2. From the common actions menu open the Roll Scheduler
    dialogue window. The duration in days will default to 14. Set
    The Roll Date Schedule to (2 nd option) Every 3 days, at time
    12:00 am, press preview once this has been set.
    
    
    3. The preview shows the incorrect dates as the calculation to
    determine the next roll date is now incorrect summing up the
    next day.
    
    RESULTS:
    
    The next previewed roll date is not correct, it is off by a few
    days.
    
    EXPECTED RESULTS:
    
    That the correct days would have been displayed.
    
    
    Reported in Version:
    
    7.6.1.3-IFIX20230628-1738 Build 20220823-0909 DB Build V7613-344
    HFDB Build HF7613-101
    Scheduler 7.6.8.2 Build 20220823-0909 DB Build V7682-23 HFDB
    Build HF7682-09
    

Local fix

  • n/a
    

Problem summary

  • ****************************************************************
    * USERS AFFECTED:                                              *
    * Scheduler users                                              *
    ****************************************************************
    

Problem conclusion

  • A fix for this APAR will be included in a future release.
    

Temporary fix

Comments

APAR Information

  • APAR number

    IJ49089

  • Reported component name

    MAXIMO SCHEDULE

  • Reported component ID

    5724R46SE

  • Reported release

    768

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt / Xsystem

  • Submitted date

    2023-11-02

  • Closed date

    2023-11-07

  • Last modified date

    2023-11-07

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Fix information

  • Fixed component name

    MAXIMO SCHEDULE

  • Fixed component ID

    5724R46SE

Applicable component levels

[{"Business Unit":{"code":"BU059","label":"IBM Software w\/o TPS"},"Product":{"code":"SS9NUN","label":"Maximo Asset Management Scheduler"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"768","Line of Business":{"code":"LOB59","label":"Sustainability Software"}}]

Document Information

Modified date:
07 November 2023