APAR status
Closed as program error.
Error description
STEPS TO REPRODUCE: 1. Go to Purchase Contracts application. 2. Create a new Purchase Contract against Vendor BWC. 3. Go to Contract Lines tab. 4. Enter 2 new Contract Lines as the following info: Line 1: Line Type: Item Item: EB12 - 12 Volt Battery Quantity: 10.00 Order Unit: EACH Unit Cost: 10.00 Line 2: Line Type: Standard Service Item: ELEV - ELEVATOR REPAIR SERVICE Quantity: 10.00 Order Unit: EACH Unit Cost: 10.00 5. Save the record. 6. Authorize the BEDFORD Site. 7. Approve the Contract. 8. Go to Create (Desktop) Requisition application. 9. Accept the default values and click on Continue. 10. In the Requisition Line Items section, click on New Row button. 11. Enter the following info: Line Type: Item Item: EB12 (then hit the Tab key) Vendor: BWC (then hit the Tab key) 12. Note that the system brings up the Unit Cost 10.00 from the Purchase Contract above. That's OK. 13. Enter Quantity 1.00. 14. Still in the Requisition Line Items section, click on New Row button again. 15. Enter the following info: Line Type: Standard Service Item: ELEV (then hit the Tab key) Vendor: BWC (then hit the Tab key) RESULTS: When the Line Type is Standard Service, the system does not bring the Unit Cost from the Purchase Contract and the Unit Cost remains zeroed. This is the issue. EXPECTED RESULTS: The system should bring the Unit Cost from the Purchase Contract regardless the Line Type. REPORTED IN VERSION: IBM Maximo Asset Management 7.6.1.3
Local fix
Problem summary
**************************************************************** * USERS AFFECTED: * * _MAXIMO_ * **************************************************************** * PROBLEM DESCRIPTION: * * WHILE CREATING DESKTOP REQUISITION OF SERVICE ITEM, THE * * SYSTEM DOES NOT BRING UNIT COST FROM PURCHASE CONTRACT * **************************************************************** Currently, When the Line Type is Item, and when we add the itemnum the system brings up the standard cost from the inventory as unit cost. and when we add the vendor, the system brings up the unit cost from the purchase contract for that particular vendor. The Issue - When the Line Type is Standard Service (or line type any other than item and tool), the system does not bring the Unit Cost from the Purchase Contract and the Unit Cost remains zeroed. After the fix - When the Line Type is Standard Service / Service / Material (line type any other than item and tool), and when we add the itemnum, the system does not bring the Unit Cost as there is no standard cost for it. and when we add the vendor, the system brings up the unit cost from the purchase contract for that particular vendor.
Problem conclusion
The fix for this APAR will be contained in a future release.
Temporary fix
Comments
APAR Information
APAR number
IJ49062
Reported component name
PURCHASING
Reported component ID
5724R46PU
Reported release
760
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt / Xsystem
Submitted date
2023-10-30
Closed date
2023-11-01
Last modified date
2023-11-01
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Fix information
Fixed component name
PURCHASING
Fixed component ID
5724R46PU
Applicable component levels
[{"Business Unit":{"code":"BU059","label":"IBM Software w\/o TPS"},"Product":{"code":"SSLKT6","label":"Maximo Asset Management"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"760","Line of Business":{"code":"LOB59","label":"Sustainability Software"}}]
Document Information
Modified date:
01 November 2023