IBM Support

IJ45267: UPON SUBMIT OF SCHEDULED REPORT, YEAR CHANGES TO THE FOLLOWING YEAR

Subscribe to this APAR

By subscribing, you receive periodic emails alerting you to the status of the APAR, along with a link to the fix after it becomes available. You can track this item individually or track all items by product.

Notify me when this APAR changes.

Notify me when an APAR for this component changes.

 

APAR status

  • Closed as program error.

Error description

  • Problem Description:
    If you select a valid time using the date picker when scheduling
    a report, but then wait to submit the schedule until after that
    time has passed, the schedule will still submit but the year
    will be changed to the following year.
    
    STEPS TO REPRODUCE:
    1. Go to Report Administrator
    2. Search and select any report
    3. Click "Preview Button"
    4. Select "At this Time" radio button
    5. Enter your email in the "To" Field"
    6. Click the Calendar Icon and enter Date and Time within the
    next 15 minutes
    7. Once the Calendar UI control closed, wait for the time to
    past and click submit
    8. Go to View Schedule report and check the schedule
    
    RESULTS:
    9. Report Schedule will increment by 1 year
    
    EXPECTED RESULTS:
    
    Should probably be caught as an exception upon submit as the
    requested time is now in the past
    
    PRODUCT VERSION:
    7612
    

Local fix

Problem summary

  • ****************************************************************
    * USERS AFFECTED:                                              *
    * MAXIMO                                                       *
    ****************************************************************
    * PROBLEM DESCRIPTION:                                         *
    * If you select a valid time using the date picker when        *
    * scheduling                                                   *
    * a report, but then wait to submit the schedule until after   *
    * that                                                         *
    * time has passed, the schedule will still submit but the      *
    * year                                                         *
    * will be changed to the following year.                       *
    ****************************************************************
    

Problem conclusion

  • The fix for this APAR is contained in the following maintenance
    package: release\fix pack for Release 8.x Product
    

Temporary fix

Comments

APAR Information

  • APAR number

    IJ45267

  • Reported component name

    MAXIMO REPORTIN

  • Reported component ID

    TIVOREPTS

  • Reported release

    761

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt / Xsystem

  • Submitted date

    2023-02-07

  • Closed date

    2023-04-16

  • Last modified date

    2023-04-16

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Fix information

  • Fixed component name

    MAXIMO REPORTIN

  • Fixed component ID

    TIVOREPTS

Applicable component levels

[{"Business Unit":{"code":"BU059","label":"IBM Software w\/o TPS"},"Product":{"code":"SSLKT6","label":"Maximo Asset Management"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"761","Line of Business":{"code":"LOB59","label":"Sustainability Software"}}]

Document Information

Modified date:
16 April 2023