IBM Support

IJ44901: IN WORK EXECUTION WORK CENTER METER READING WITH A DECIMAL VALUE CANNOT BE ENTERED IF THE DECIMAL SEPARATOR IS COMMA

Subscribe to this APAR

By subscribing, you receive periodic emails alerting you to the status of the APAR, along with a link to the fix after it becomes available. You can track this item individually or track all items by product.

Notify me when this APAR changes.

Notify me when an APAR for this component changes.

 

APAR status

  • Closed as program error.

Error description

  • When the Locale is a language with decimal separator comma, a
    meter reading with decimal value ignores the decimal separator
    if language is English or cannot be saved if the language is one
    that has comma as decimal separator.
    STEPS TO REPRODUCE:
    1.	In Maximo click Profile > Default Information and select:
    a.	Language: EN
    b.	Locale: de_DE
    c.	Log out and log in
    2.	Open the Assets application and search an asset with a
    CONTINUOUS meter: 11430, meter RUNHOURS, Last Reading: e.g.,
    5471
    3.	Open the Work Order Tracking application and click to create
    a new work order
    a.	Description: WO meter reading
    b.	Asset: 11430
    c.	Save
    d.	Click Take Ownership
    4.	Open the Work Execution work center
    5.	Open the details for the work order just created
    6.	Scroll to asset meter reading
    7.	Click to enter a new meter reading: it is only possible to
    enter 1.5 not 1,5
    8.	Select Delta, then Save  the decimal separator is ignored,
    the new value of the meter is 5.486 (5471+15)
    
    9.	In an environment with a second language having decimal
    separator comma, in Maximo click Profile > Default Information
    and select:
    a.	Language: e.g., FR
    b.	Locale: fr_FR
    10.	Repeat the steps 2-7
    
    11.	Select Delta, then Save  an error message is displayed
    requesting a value with decimal valid
    RESULT:
    Meter reading is either incorrect or cannot be entered
    EXPECTED RESULT:
    It should be possible to enter meter reading
    REPORTED IN VERSION:
    Tivoli's process automation engine 7.6.1.1
    

Local fix

Problem summary

  • ****************************************************************
    * PROBLEM DESCRIPTION:                                         *
    * IN WORK EXECUTION WORK CENTER METER READING WITH A DECIMAL   *
    * VALUE CANNOT BE ENTERED IF THE DECIMAL SEPARATOR IS COMMA    *
    ****************************************************************
    

Problem conclusion

  • The fix for this APAR will be included in a future release
    

Temporary fix

Comments

APAR Information

  • APAR number

    IJ44901

  • Reported component name

    MAXIMO ASST MGM

  • Reported component ID

    5724R46AM

  • Reported release

    761

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt / Xsystem

  • Submitted date

    2023-01-10

  • Closed date

    2023-01-24

  • Last modified date

    2023-01-24

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Fix information

  • Fixed component name

    MAXIMO ASST MGM

  • Fixed component ID

    5724R46AM

Applicable component levels

[{"Business Unit":{"code":"BU059","label":"IBM Software w\/o TPS"},"Product":{"code":"SSLKT6","label":"Maximo Asset Management"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"761","Line of Business":{"code":"LOB59","label":"Sustainability Software"}}]

Document Information

Modified date:
24 January 2023