PROBLEM DESCRIPTION: The Material's Required Date is not changed when you reschedule a WO using Graphical Scheduling, even though the UPDATEWPMATREQDATE variable is enabled. STEPS TO REPRODUCE: * By default the property in MAXVARS that controls this setting is not set and it is also not available through Organisations. The description of the property is Update WPMaterial Required Dates when the Schedule Start date of the WO is updated?. * Log onto the database and execute the following SQL: update maxvars set varvalue=1 where varname='UPDATEWPMATREQDATE' * Restart Maximo application server to ensure it reads the new value in MAXVARS * Log into Maximo. * Go to Organizations, select your Org, go to Work Order Options / Edit Rules. * Enable all the options for APPR status and save. * Open Work Order Tracking * Create a new Work Order record with a Target Start Date in the future (eg, Nov 1). * Add Planned Labour, e.g. Electrician for 1 hour * Add Planned Material as an Item from a storeroom. Note that the Required Date defaults to the Target Start Date specified. * Approve the Work Order. * Set the Scheduled Start on the Work Order to the following day and save. (eg, Nov 2). * Go to Plans tab / Material sub-tab: the Required Date is now correctly updated to match the newly-entered SCHEDULE Start Date (ie, to Nov 2). So the new value (1) of the UPDATEWPMATREQDATE variable is taken into account. * Create a saved query for this WO. * Go to Graphical Scheduling and create a new record. * Ensure the End Date is beyond the WOs Scheduled Start Date. * In Work Queries section, add the query for this WO. * Save the record and go to Graphical View tab. * The record shows in the Gantt View table with Start Date = Nov 2. * Move the WO to two days later (ie, Nov 4) using the Calendar icon on the Start Date column. * Save the record and then do Commit Changes. * Go back to Work Order Tracking and open the WO. * Check the Scheduled Start Date: it has been moved to that new date (Nov 4), which is correct. * Go to Plans tab and Material sub-tab and expand the row for the Item request. * The Required Date value has not changed and still shows the date that was initially set for Scheduled Date in the WO (ie, Nov 2). RESULTS: The Required Date value has not been updated by the change to the Scheduled Start Date that was made for this WO in Graphical Scheduling. EXPECTED RESULTS: The Required Date value in the WOs Plans tab and Material sub-tab should also be updated by the change made to the Scheduled Start Date for this WO in Graphical Scheduling. REPORTED IN VERSION: Maximo TPAE 7.6.1.2
Local fix
manually change the Required Date in the WO's Planned Material to match the Scheduled Start date.
Problem summary
**************************************************************** * USERS AFFECTED: * * Scheduler users * ****************************************************************
Problem conclusion
The fix for this APAR will be included in a future release.
Temporary fix
Comments
APAR Information
APAR number
IJ44014
Reported component name
MAXIMO ASST MGM
Reported component ID
5724R46AM
Reported release
761
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt / Xsystem
Submitted date
2022-10-27
Closed date
2022-11-02
Last modified date
2022-11-02
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Fix information
Fixed component name
MAXIMO ASST MGM
Fixed component ID
5724R46AM
Applicable component levels
[{"Business Unit":{"code":"BU059","label":"IBM Software w\/o TPS"},"Product":{"code":"SSLKT6","label":"Maximo Asset Management"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"761","Line of Business":{"code":"LOB59","label":"Sustainability Software"}}]
Document Information
Modified date:
03 November 2022