IBM Support

IJ43773: THE LINECOST2 POCOST IS INCORRECT WHEN YOU DISTRIBUTE COSTS

Subscribe to this APAR

By subscribing, you receive periodic emails alerting you to the status of the APAR, along with a link to the fix after it becomes available. You can track this item individually or track all items by product.

Notify me when this APAR changes.

Notify me when an APAR for this component changes.

 

APAR status

  • Closed as program error.

Error description

  • When you have base currency and base 2 currency set in the Org
    application and your purchase order has distributed cost the
    linecost2 is not calculating correctly for POCOST.
    
    STEPS TO REPRODUCE:
    
    1. In the organization application set a currency 2 as CAD and
    save.
    
    2. The exchange application set an exchange rate from USD to
    CAD and CAD to USD. (make sure to use real exchange values)
    3. Set CAD currency on a company record.
    4. Create a new PO and add the company that has the CAD currency
    set against it.
    5. On the POLINES tab add a new line and use item 013, quantity
    of 1 and check the issue on receipt box. Add a GL account and a
    unit cost of 1000$, save the PO.
    6. Click the distribute cost button and distribute the cost 40%,
    30% and 30%, add 3 gl accounts as needed, save and approve the
    PO.
    7. In the receiving application do a full receipt of the item,
    save. Run the query below
    select matrectransid,ponum, issuetype,
    quantity,unitcost,linecost,linecost2,exchangerate,exchangerate2
    from MATRECTRANS where ponum = 'XXX' order by matrectransid asc;
    
    
    Notice that linecost 2 shows the full line cost as 1000$ instead
    of the amount based on the distributed cost. For instance, the
    line with 0.4% shows the linecost 2 as 1000 instead of the 504.
    
    
    Now return the item, run the above query again and notice that
    on return we now see the correct values being used.
    
    
    Reported in Version:
    
    Maximo 7.6.1.2
    

Local fix

  • n/a
    

Problem summary

  • ****************************************************************
    * USERS AFFECTED:                                              *
    * MAXIMO                                                       *
    ****************************************************************
    * PROBLEM DESCRIPTION:                                         *
    * THE LINECOST2 POCOST IS INCORRECT WHEN YOU DISTRIBUTE COSTS  *
    ****************************************************************
    

Problem conclusion

  • The fix for this APAR will be contained in a future release.
    

Temporary fix

Comments

APAR Information

  • APAR number

    IJ43773

  • Reported component name

    MAXIMO ASST MGM

  • Reported component ID

    5724R46AM

  • Reported release

    761

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt / Xsystem

  • Submitted date

    2022-10-11

  • Closed date

    2023-10-27

  • Last modified date

    2023-10-27

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Fix information

  • Fixed component name

    MAXIMO ASST MGM

  • Fixed component ID

    5724R46AM

Applicable component levels

[{"Business Unit":{"code":"BU059","label":"IBM Software w\/o TPS"},"Product":{"code":"SSLKT6","label":"Maximo Asset Management"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"761","Line of Business":{"code":"LOB59","label":"Sustainability Software"}}]

Document Information

Modified date:
27 October 2023