APAR status
Closed as program error.
Error description
Description: The Requirement Status for a Required Tool in the Crew Assignment Status dialog shows OK when the assigned tool asset is any synonym of NOT READY or DECOMMISSIONED, and also OK if the asset is located in a location of type REPAIR, SALVAGE or VENDOR (or their synonyms). In both cases, this would suggest the tool asset is unavailable and perhaps the Requirement Status should read NOT AVAILABLE. STEPS TO REPRODUCE: 1. In Scheduler demo site and for crew BSTOHL1, Crew Assignment Status shows OK for the required tool. 2. On Tool Assignments tab navigate to Assets application for asset BSTBTRUCK1 and change status to DECOMMISSIONED or NOT READY and review Crew Assignment Status again: RESULT: The Crew Assignment status is still shown as OK EXPECTED RESULT: The Crew Assignment status should be shown as NOT AVAILABLE as the asset is not available to be used. PRODUCT: TPAE 7612
Local fix
Problem summary
**************************************************************** * USERS AFFECTED: * * All users using Crew Tools * **************************************************************** * PROBLEM DESCRIPTION: * * CREW ASSIGNMENT STATUS FOR A TOOL ASSIGNMENT SHOWS OK WHEN * * THE ASSET IS DECOMMISSIONED * ****************************************************************
Problem conclusion
Fixed
Temporary fix
Comments
APAR Information
APAR number
IJ39803
Reported component name
MAXIMO ASST MGM
Reported component ID
5724R46AM
Reported release
761
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt / Xsystem
Submitted date
2022-05-05
Closed date
2022-11-13
Last modified date
2022-11-13
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Fix information
Fixed component name
MAXIMO ASST MGM
Fixed component ID
5724R46AM
Applicable component levels
[{"Business Unit":{"code":"BU059","label":"IBM Software w\/o TPS"},"Product":{"code":"SSLKT6","label":"Maximo Asset Management"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"761","Line of Business":{"code":"LOB59","label":"Sustainability Software"}}]
Document Information
Modified date:
14 November 2022