APAR status
Closed as program error.
Error description
DESCRIPTION: If the Priority field value of a Measure Point is updated to use a value other than the value of the associated Job Plan or PM, then the resulting Work Order Priority field value will still use the Job Plan or PM Priority value. STEPS TO REPRODUCE: 1. Log in to maxdemo instance 2. Go To Planning | Job Plans 3. Common Actions | New Job Plan 4. In the Job Plan field enter "JP-01" 5. In the Description field enter "Job Plan 01" 6. In the WO Priority field enter 3 7. In the Job Plan Tasks section click the New Row button 8. In the Task 10 Description field enter "Task One" 9. Save the record 10. Common Actions | Change Status 11. In the New Status field click the drop-down arrow, then click Active 12. Click OK 13. Go To Assets | Locations 14. Common Actions | New Location 15. In the Location field enter "L-01" 16. In the Description field enter "Location 01" 17. In the Type field | Select Value | click OPERATING 18. In the Priority field enter 1 19. Save the record 20. Go To Assets | Assets 21. Common Actions | New Asset 22. In the Asset field enter "A-001" 23. In the Description field enter "Asset 001" 24. In the Location field enter "L-01" and tab out 25. On the Meters tab | Meter field | Select Value | click OILCOLOR 26. Save the record 27. Common Actions | Change Status 28. In the New Status field click the drop-down arrow, then click OPERATING 29. Click OK 30. Go To Preventive Maintenance | Preventive Maintenance 31. Common Actions | New PM 32. In the PM field enter "P-001" 33. In the Description field enter "PM 001" 34. In the Asset field enter "a-001" and tab out 35. In the Priority field enter 4 36. On the Frequency tab | Estimated Next Due Date field | click the Select Date button 37. Click today's date 38. Save the record 39. Common Actions | Change Status 40. In the New Status field click the drop-down arrow, then click Active 41. Click OK 42. Go To Assets | Condition Monitoring 43. Common Actions | New Measure Point 44. In the Point field enter "OC-001" 45. In the Description field enter "Oil Color 01" 46. In the Asset field enter "a-01" and tab out 47. In the Meter field enter "oilcolor" and tab out 48. In the Characteristic Action Values section click the New Row button 49. In the Value field | Select Value | click BROWN 50. In the Job Plan field enter "jp-01" and tab out 51. In the Priority field replace the default value (3) with 5 52. Save the record 53. Go To Assets | Assets 54. In the Asset field enter "a-001" and press Enter 55. Click A-001 to open the record 56. More Actions | Enter Meter Readings 57. In the New Reading field | Select Value | click BROWN 58. Click OK 59. Go To Assets | Condition Monitoring 60. In the Point field enter "oc-001" and press Enter 61. Click OC-001 to open the record 62. In the Measurements section verify that the reading was populated 63. More Actions | Generate Work Order 64. Click OK 65. In the System Message, note the Work Order number that was generated, then click OK 66. Go To Work Orders | Work Order Tracking 67. In the Work Order field enter the number of the Work Order that was generated, then press Enter 68. Click the record to open it 69. View the values in the Asset/Location Priority and Priority fields (1,3) *RESULT: The Work Order is created with a Priority value of 3 from the Job Plan *EXPECTED RESULT: The Work Order is created with a Priority value of 5 from the Measure Point 70. Update the condition monitoring point charpointaction to use your PM from step 2 rather than the job plan from step 1. Enter a new Reading and generate using thresholds. Note that the resulting work order uses the expected priority 5 71. Go to Assets | Condition Monitoring 72. In the Point field enter "oc-001" and press Enter 73. Click OC-001 to open the record 74. Expand the details of the row in the Characteristic Action Values section 75. Delete the value from the Job Plan field 76. In the PM field | Detail Menu | Select Value 77. Click P-001 78. Note that the Priority field populates with the PM Priority value of 4 79. Save the record 80. Go To Assets | Assets 81. In the Asset field enter "a-001" and press Enter 82. Click A-001 to open the record 83. More Actions | Enter Meter Readings 84. In the New Reading field | Select Value | click BROWN 85. Click OK 86. Go To Assets | Condition Monitoring 87. In the Point field enter "oc-001" and press Enter 88. Click OC-001 to open the record 89. In the Measurements section verify that the reading was populated 90. More Actions | Generate Work Order 91. Click OK 92. In the System Message, note the Work Order number that was generated, then click OK 93. Go To Work Orders | Work Order Tracking 94. In the Work Order field enter the number of the Work Order that was generated, then press Enter 95. Click the record to open it 96. View the values in the Asset/Location Priority and Priority fields RESULT: The Work Order is created with a Priority value of 4 from the PM EXPECTED RESULT: The Work Order is created with a Priority value of 5 from the Measure Point REPORTED IN VERSION: Tivoli's process automation engine 7.6.1.2-IFIX20210323-1206 Build 20200715-0100
Local fix
Problem summary
**************************************************************** * USERS AFFECTED: * * Maximo users * **************************************************************** * PROBLEM DESCRIPTION: * * If the Priority field value of a Measure Point is updated to * * use a value other than the value of the associated Job Plan * * or * * PM, then the resulting Work Order Priority field value will * * still use the Job Plan or PM Priority value. * **************************************************************** STEPS TO REPRODUCE: 1. Log in to maxdemo instance 2. Go To Planning - Job Plans 3. Common Actions - New Job Plan 4. In the Job Plan field enter "JP-01" 5. In the Description field enter "Job Plan 01" 6. In the WO Priority field enter 3 7. In the Job Plan Tasks section click the New Row button 8. In the Task 10 Description field enter "Task One" 9. Save the record 10. Common Actions - Change Status 11. In the New Status field click the drop-down arrow, then click Active 12. Click OK 13. Go To Assets - Locations 14. Common Actions - New Location 15. In the Location field enter "L-01" 16. In the Description field enter "Location 01" 17. In the Type field - Select Value - click OPERATING 18. In the Priority field enter 1 19. Save the record 20. Go To Assets - Assets 21. Common Actions - New Asset 22. In the Asset field enter "A-001" 23. In the Description field enter "Asset 001" 24. In the Location field enter "L-01" and tab out 25. On the Meters tab - Meter field - Select Value - click OILCOLOR 26. Save the record 27. Common Actions - Change Status 28. In the New Status field click the drop-down arrow, then click OPERATING 29. Click OK 30. Go To Preventive Maintenance - Preventive Maintenance 31. Common Actions - New PM 32. In the PM field enter "P-001" 33. In the Description field enter "PM 001" 34. In the Asset field enter "a-001" and tab out 35. In the Priority field enter 4 36. On the Frequency tab - Estimated Next Due Date field - click the Select Date button 37. Click today's date 38. Save the record 39. Common Actions - Change Status 40. In the New Status field click the drop-down arrow, then click Active 41. Click OK 42. Go To Assets - Condition Monitoring 43. Common Actions - New Measure Point 44. In the Point field enter "OC-001" 45. In the Description field enter "Oil Color 01" 46. In the Asset field enter "a-01" and tab out 47. In the Meter field enter "oilcolor" and tab out 48. In the Characteristic Action Values section click the New Row button 49. In the Value field - Select Value - click BROWN 50. In the Job Plan field enter "jp-01" and tab out 51. In the Priority field replace the default value (3) with 5 52. Save the record 53. Go To Assets - Assets 54. In the Asset field enter "a-001" and press Enter 55. Click A-001 to open the record 56. More Actions - Enter Meter Readings 57. In the New Reading field - Select Value - click BROWN 58. Click OK 59. Go To Assets - Condition Monitoring 60. In the Point field enter "oc-001" and press Enter 61. Click OC-001 to open the record 62. In the Measurements section verify that the reading was populated 63. More Actions - Generate Work Order 64. Click OK 65. In the System Message, note the Work Order number that was generated, then click OK 66. Go To Work Orders - Work Order Tracking 67. In the Work Order field enter the number of the Work Order that was generated, then press Enter 68. Click the record to open it 69. View the values in the Asset/Location Priority and Priority fields (1,3) *RESULT: The Work Order is created with a Priority value of 3 from the Job Plan *EXPECTED RESULT: The Work Order is created with a Priority value of 5 from the Measure Point 70. Update the condition monitoring point charpointaction to use your PM from step 2 rather than the job plan from step 1. Enter a new Reading and generate using thresholds. Note that the resulting work order uses the expected priority 5 71. Go to Assets - Condition Monitoring 72. In the Point field enter "oc-001" and press Enter 73. Click OC-001 to open the record 74. Expand the details of the row in the Characteristic Action Values section 75. Delete the value from the Job Plan field 76. In the PM field - Detail Menu - Select Value 77. Click P-001 78. Note that the Priority field populates with the PM Priority value of 4 79. Save the record 80. Go To Assets - Assets 81. In the Asset field enter "a-001" and press Enter 82. Click A-001 to open the record 83. More Actions - Enter Meter Readings 84. In the New Reading field - Select Value - click BROWN 85. Click OK 86. Go To Assets - Condition Monitoring 87. In the Point field enter "oc-001" and press Enter 88. Click OC-001 to open the record 89. In the Measurements section verify that the reading was populated 90. More Actions - Generate Work Order 91. Click OK 92. In the System Message, note the Work Order number that was generated, then click OK 93. Go To Work Orders - Work Order Tracking 94. In the Work Order field enter the number of the Work Order that was generated, then press Enter 95. Click the record to open it 96. View the values in the Asset/Location Priority and Priority fields RESULT: The Work Order is created with a Priority value of 4 from the PM EXPECTED RESULT: The Work Order is created with a Priority value of 5 from the Measure Point
Problem conclusion
The fix for this APAR is contained in the following maintenance package: Release 7.6.1.3 of Base Services
Temporary fix
Comments
APAR Information
APAR number
IJ35273
Reported component name
MAXIMO ASST MGM
Reported component ID
5724R46AM
Reported release
761
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt / Xsystem
Submitted date
2021-09-30
Closed date
2022-02-23
Last modified date
2022-02-23
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Fix information
Fixed component name
MAXIMO ASST MGM
Fixed component ID
5724R46AM
Applicable component levels
[{"Line of Business":{"code":"LOB59","label":"Sustainability Software"},"Business Unit":{"code":"BU059","label":"IBM Software w\/o TPS"},"Product":{"code":"SSLKT6","label":"Maximo Asset Management"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"761"}]
Document Information
Modified date:
24 February 2022