APAR status
Closed as program error.
Error description
STEPS TO REPRODUCE: - Open the Graphical Resource View application. - Select an existing record and go to Graphical View tab. - The Labor records and their Day shifts are showing in Graphical View. The standard work shift is 9:00AM-5:00PM. - Select category EXTRA TIME in the drop-down menu, Partial Day and then click on a shift in the calendar view. - Add EXTRA TIME time for 8:00AM-9:00PM to a shift in GRV's Graphical View tab. - The 'Shift Information' section of the information pop-up box (displayed with Option + left-click on Mac / Alt + left-click on Windows) displays a new shift Start-End time of 8:00AM-5:00PM. - This time, add EXTRA TIME time for 5:00PM-6:00PM to another shift in GRV's Graphical View tab. - The 'Shift Information' section of the information pop-up box displays a new shift Start-End time of 9:00AM-6:00PM. - Add a 1-hour unavailability of Type MEET or NON-WORK at 4PM-5PM for the Labor record on a different day, in the last hour of their shift. - This time, the 'Shift Information' section of the information pop-up box shows the Shift covering 9:00AM-4:00PM and the duration is 8 hours - 1 hour MEET/NON-WORK = 7 hours. - Add a 1-hour unavailability of Type MEET or NON-WORK at 9AM-10AM for the Labor record on a different day, in the first hour of their shift. - This time, the 'Shift Information' section of the information pop-up box shows the Shift still covering the full 9:00AM-5:00PM but the duration is 8 hours - 1 hour MEET/NON-WORK = 7 hours. RESULTS: The shift's Start and End times in the 'Shift Information' section of the information pop-up box changes when EXTRA TIME is added to the shift or or if you add non-work time that ends at the same time as the standard shift. EXPECTED RESULTS: The shift's Start and End times in the 'Shift Information' section of the information pop-up box should never change, regardless whether you add time (EXTRA TIME) or remove time (SICK, VAC, MEET, etc.). REPORTED IN VERSION: Maximo TPAE 7.6.1.2 with Scheduler 7.6.8.0
Local fix
N/A
Problem summary
**************************************************************** * USERS AFFECTED: * * Scheduler users * ****************************************************************
Problem conclusion
The fix for this APAR is contained in the following maintenance package: Release 7.6.1.3 of Base Services
Temporary fix
Comments
APAR Information
APAR number
IJ34955
Reported component name
MAXIMO SCHEDULE
Reported component ID
5724R46SE
Reported release
768
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt / Xsystem
Submitted date
2021-09-13
Closed date
2021-12-04
Last modified date
2021-12-04
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Fix information
Fixed component name
MAXIMO SCHEDULE
Fixed component ID
5724R46SE
Applicable component levels
[{"Line of Business":{"code":"LOB59","label":"Sustainability Software"},"Business Unit":{"code":"BU059","label":"IBM Software w\/o TPS"},"Product":{"code":"SS9NUN","label":"Maximo Asset Management Scheduler"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"768"}]
Document Information
Modified date:
05 December 2021