IBM Support

IJ33915: THE LINECOST2 IN POCOST IS INCORRECT WHEN YOU DISTRIBUTE COSTS

Subscribe to this APAR

By subscribing, you receive periodic emails alerting you to the status of the APAR, along with a link to the fix after it becomes available. You can track this item individually or track all items by product.

Notify me when this APAR changes.

Notify me when an APAR for this component changes.

 

APAR status

  • Closed as program error.

Error description

  • Problem
    
    When you have base currency and base 2 currency set in the Org
    application and your purchase order has distribute cost the
    linecost2 is not calculating correctly for POCOST
    
    Steps to Reproduce
    
    Go to Organizations application
    Filter for  Eaglena
    Base Currency 1 =USD
    Base Currency 2=CAD
    Save the changes
    
    Go to the Exchange Rate application
    Exchange rate from USD to CAD
    
    Click New Row > Convert from Currency =USD
    Convert to Currency = CAD
    Populate Active Date= Current Date and Time
    Populate Expiration Date= Future Date and Time
    Populate Exchange Rate field= 1.300000
    Save the changes
    
    Go to Purchase Orders application
    Create a new PO
    Populate the Currency field = USD
    Populate Vendor field= BEX
    Click on PO Lines tab
    Add a new item
    Populate Quantity field = 2
    Populate unit cost=30.00
    Check the Issue on Receipt field
    Populate the GL account field
    Click on Distribute Costs
    Click New Row
    
    Enter 2 entries 50 percent for both
    Approved and take note of the purchase order number
    
    Go to Receiving application
    
    Receive partial example quantity 1
    Save the record
    
    Go to the database run the following query
    select matrectransid,ponum, issuetype,
    quantity,unitcost,linecost,linecost2 from MATRECTRANS where
    ponum = 'XXXX';
    
    Results
    The linecost2 is incorrect it is being duplicated with the
    Receipt Linecost2 which is also incorrect
    
    Expected Results
    The Linecost2 should reflect the exchange rate between base
    currency base 2 currency
    
    
    Reported Version
    Maximo 7.6.1.1
    

Local fix

Problem summary

  • ****************************************************************
    * USERS AFFECTED:                                              *
    * Users of PO                                                  *
    ****************************************************************
    * PROBLEM DESCRIPTION:                                         *
    * When you have base currency and base 2 currency set in the   *
    * Org application and your purchase order has distribute cost  *
    * the linecost2 is not calculating correctly for POCOST        *
    ****************************************************************
    The fix for this APAR is contained in the following maintenance
    package:
     Release 7.6.1.3 of Base Services
    

Problem conclusion

Temporary fix

Comments

APAR Information

  • APAR number

    IJ33915

  • Reported component name

    MAXIMO ASST MGM

  • Reported component ID

    5724R46AM

  • Reported release

    761

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt / Xsystem

  • Submitted date

    2021-07-22

  • Closed date

    2021-08-10

  • Last modified date

    2021-08-10

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Modules/Macros

  • Maximo
    

Fix information

  • Fixed component name

    MAXIMO ASST MGM

  • Fixed component ID

    5724R46AM

Applicable component levels

[{"Line of Business":{"code":"LOB59","label":"Sustainability Software"},"Business Unit":{"code":"BU059","label":"IBM Software w\/o TPS"},"Product":{"code":"SSLKT6","label":"Maximo Asset Management"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"761"}]

Document Information

Modified date:
11 August 2021