IBM Support

IJ33007: WHEN ASSIGNING A LABOR IN THE LABOUR ASSIGNMENT TAB OF THE CREWS APPLICATION, THE EFFECTIVE DATE FIELD IS SET INCORREC

Subscribe to this APAR

By subscribing, you receive periodic emails alerting you to the status of the APAR, along with a link to the fix after it becomes available. You can track this item individually or track all items by product.

Notify me when this APAR changes.

Notify me when an APAR for this component changes.

 

APAR status

  • Closed as program error.

Error description

  • PROBLEM: When assigning a labor in the Labour Assignment tab of
    the Crews application, the effective date field is set
    incorrectly
    
    STEPS TO REPLICATE:
    Server time zone: UTC+0
    Login User's time zone: UTC+8
    1. Go to the Crews application
    Open a crew with a shift specified
    2. Assign a labor to any position under Labour Assignment tab
    
    RESULTS: Effective Date will be set as Current Date + Shift
    start time + 8 hours
    
    EXPECTED RESULT: Effective Date should be Current Date + Shift
    start Time
    
    REPORTED IN VERSION: Maximo Asset Management 7.6.1.1 and IBM
    Maximo Asset Management Scheduler Plus 7.6.7.3
    
    AFFECTED APPLICATION (for Maximo Only):
    Crews  application
    

Local fix

  • N/A
    

Problem summary

  • ****************************************************************
    * USERS AFFECTED:                                              *
    * All Maximo users using Crews                                 *
    ****************************************************************
    * PROBLEM DESCRIPTION:                                         *
    * WHEN ASSIGNING A LABOR IN THE LABOUR ASSIGNMENT TAB OF THE   *
    * CREWS APPLICATION, THE EFFECTIVE DATE FIELD IS SET           *
    * INCORRECT.                                                   *
    ****************************************************************
    * RECOMMENDATION:                                              *
    * WHEN ASSIGNING A LABOR IN THE LABOUR ASSIGNMENT TAB OF THE   *
    * CREWS APPLICATION, THE EFFECTIVE DATE FIELD IS SET           *
    * INCORRECT.                                                   *
    ****************************************************************
    

Problem conclusion

  • Fixed the date calculation format.
    

Temporary fix

Comments

APAR Information

  • APAR number

    IJ33007

  • Reported component name

    MAXIMO ASST MGM

  • Reported component ID

    5724R46AM

  • Reported release

    761

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt / Xsystem

  • Submitted date

    2021-06-06

  • Closed date

    2021-08-02

  • Last modified date

    2021-08-02

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Modules/Macros

  • MAXIMO
    

Fix information

  • Fixed component name

    MAXIMO ASST MGM

  • Fixed component ID

    5724R46AM

Applicable component levels

[{"Line of Business":{"code":"LOB59","label":"Sustainability Software"},"Business Unit":{"code":"BU059","label":"IBM Software w\/o TPS"},"Product":{"code":"SSLKT6","label":"Maximo Asset Management"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"761"}]

Document Information

Modified date:
03 August 2021