IJ18016: HOURLY RATE FOR CREWS APPLICATION IS USING AVERAGE RATE IN STEADOF SUMMING THE RATE.

Subscribe to this APAR

By subscribing, you receive periodic emails alerting you to the status of the APAR, along with a link to the fix after it becomes available. You can track this item individually or track all items by product.

Notify me when this APAR changes.

Notify me when an APAR for this component changes.

 

APAR status

  • Closed as program error.

Error description

  • In the crew types application, the hourly rate field help states
    the following:
    
    "The sum of the individual labor rates plus the asset rates are
    assigned to the crew."
    
    However, when Maximo for Utilities is installed this does no
    apply, it will actually use the average cost.
    
    STEPS TO REPRODUCE:
    1. Create a new Crew Types record and 3 Required crafts:
    Position 1 = Driver, craft = OLM for a rate of 22$
    Position 2= Helper, craft = Network for a rate of 100$
    Position 3= Leader, craft = Hardware for a rate of 140$.
    
    When we look at the Hourly rate for the record it shows a total
    of 87.33, instead of the sum of the values which would be 262$.
    Please note that it will also take the average of the tool as
    well.
    
    EXPECTED RESULTS
    
    That the values would have been the sum and not average of the
    total crew.
    
    Reported in Version:
    
    IBM Maximo for Utilities 7.6.0.2
    

Local fix

  • n/a
    

Problem summary

  • ****************************************************************
    * USERS AFFECTED:                                              *
    * All Maximo users using Utilities Crews                       *
    ****************************************************************
    * PROBLEM DESCRIPTION:                                         *
    * HOURLY RATE FOR CREWS APPLICATION IS USING AVERAGE RATE      *
    * INSTEAD OF SUMMING THE RATE.                                 *
    ****************************************************************
    * RECOMMENDATION:                                              *
    * HOURLY RATE FOR CREWS APPLICATION IS USING AVERAGE RATE      *
    * INSTEAD OF SUMMING THE RATE.                                 *
    ****************************************************************
    

Problem conclusion

  • The crew rate will be calculated as a sum for Utilities users
    using crew duration maxvar SUM.
    

Temporary fix

Comments

APAR Information

  • APAR number

    IJ18016

  • Reported component name

    MAXIMO UTILITIE

  • Reported component ID

    5724R5600

  • Reported release

    760

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt / Xsystem

  • Submitted date

    2019-07-31

  • Closed date

    2022-02-21

  • Last modified date

    2022-02-21

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Modules/Macros

  • MAXIMO
    

Fix information

  • Fixed component name

    MAXIMO UTILITIE

  • Fixed component ID

    5724R5600

Applicable component levels

[{"Line of Business":{"code":"LOB59","label":"Sustainability Software"},"Business Unit":{"code":"BU059","label":"IBM Software w\/o TPS"},"Product":{"code":"SSLLAM","label":"Maximo for Utilities"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"760"}]

Document Information

Modified date:
22 February 2022