IJ17194: RESCHEDULE/REASSIGN ACTION IN WOTRACK DOES NOT WORK FOR CREW ASSIGNMENTS THAT WERE CREATED FROM A JOB PLAN

Subscribe to this APAR

By subscribing, you receive periodic emails alerting you to the status of the APAR, along with a link to the fix after it becomes available. You can track this item individually or track all items by product.

Notify me when this APAR changes.

Notify me when an APAR for this component changes.

 

APAR status

  • Closed as program error.

Error description

  • ERROR DESCRIPTION:Ø
    RESCHEDULE/REASSIGN ACTION IN WOTRACK works when the Crew is
    added on the Planned Labor tab in WOTrack and it fails if the
    Crew Planned Labor comes from a Job Plan.
    
    It works in Graphical Assignment for both kinds of Crew Planned
    Labor.
    
    Steps to Reproduce:
    1. Create a new Job Plan with a 6 hour duration
    2. Add 2 tasks:   Task 10  duration 4  Interruptible
     - Task 20 duration 2, Interruptible
    3. Add a Crew Type for Labor, the same Crew Type for Task 10
    and for Task 20
    4. Save and Change Status to Active
    5. Create a new WO with the new JP
    6. On the Assignments tab pick an Available Crew for each
    Assignment row
    7. Select Reschedule/Unassign Assignments from the Common
    Actions menu.    Uncheck Reschedule  the Assignments.    Click
    OK.
    
    RESULTS:
    The top message says all are unassigned but they are not.
    Both are still there with a Scheduled date and Status of
    ASSIGNED.
    
    EXPECTED RESULTS:
    The assignments should be unassigned.   The Crew field should
    be nulled out, the Start Date should be nulled out and the
    Status should be reset to WAITASGN.
    
    VERSION INFOMATION:
    This has been reproduced in 7.6.1.0 and in 7.6.1.1.
    

Local fix

Problem summary

  • ****************************************************************
    * USERS AFFECTED:                                              *
    * All users using Crew Assignments                             *
    ****************************************************************
    * PROBLEM DESCRIPTION:                                         *
    * RESCHEDULE/REASSIGN ACTION IN WOTRACK DOES NOT WORK FOR CREW *
    * ASSIGNMENTS THAT WERE CREATED FROM A JOB PLAN                *
    ****************************************************************
    * RECOMMENDATION:                                              *
    * RESCHEDULE/REASSIGN ACTION IN WOTRACK DOES NOT WORK FOR CREW *
    * ASSIGNMENTS THAT WERE CREATED FROM A JOB PLAN                *
    ****************************************************************
    

Problem conclusion

  • Problem is fixed
    

Temporary fix

Comments

APAR Information

  • APAR number

    IJ17194

  • Reported component name

    WORK ORDERS

  • Reported component ID

    5724R46WO

  • Reported release

    760

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt / Xsystem

  • Submitted date

    2019-06-24

  • Closed date

    2022-01-27

  • Last modified date

    2022-01-27

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Fix information

  • Fixed component name

    WORK ORDERS

  • Fixed component ID

    5724R46WO

Applicable component levels

[{"Line of Business":{"code":"LOB59","label":"Sustainability Software"},"Business Unit":{"code":"BU059","label":"IBM Software w\/o TPS"},"Product":{"code":"SSLKT6","label":"Maximo Asset Management"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"760"}]

Document Information

Modified date:
28 January 2022