APAR status
Closed as program error.
Error description
PROBLEM: Assignment duration increases for work orders with multiple assignments STEPS TO REPRODUCE: 1. Go to Work Order Tracking application 2. Create a new work order e.g. work order TESTWO1 3. Go to Assignments tab and click New Row button Enter a description for the first assignment. Enter a craft and enter a scheduled start date e.g. 5/13/19 11:00 AM for 0:45 hours 4. Click New Row button to create another assignment Enter a description, a craft, enter scheduled start date e.g. 5/13/19 10:45 AM for 25:00 hours 5. Go to Graphical Assignment application and create a work list to bring in the work order created in step 2 above e.g. work order TESTWO1 6. Go to Work View tab and work order TESTWO1 shows up 7. Drag the work bar of one of the assignments to a future date from the Gantt view e.g. Locate the work bar for the assignment that requires 0:45 hours to complete. Click and drag the work bar from 5/13/19 11:00 AM to drop it to 5/14/19 11:00AM RESULTS: Duration of the assignment increases to the sum of duration between the starting point of the assignment to the new date in future to which it was dragged to e.g. Duration of the assignment should have been 0:45 hours. After moving the assignment to 5/14/19 10:00AM , the duration has increased to 24 hours. Please note that this behaviour is observed on only work orders with multiple assignments. There is no duration increase on work orders with a single assignment. EXPECTED RESULTS: Moving an assignment to a future date should NOT change the duration of an assignment. PRODUCT VERSION: IBM Maximo for Scheduler 7.6.7.0
Local fix
Problem summary
**************************************************************** * USERS AFFECTED: * * Users of the Graphical Assignment application in Scheduler * * 7.6.7. * **************************************************************** * PROBLEM DESCRIPTION: * * ASSIGNMENT DURATION INCREASES FOR WORK ORDERS WITH MULTIPLE * * ASSIGNMENTS * **************************************************************** * RECOMMENDATION: * ****************************************************************
Problem conclusion
A code fix has been made.
Temporary fix
Comments
APAR Information
APAR number
IJ16087
Reported component name
MAXIMO SCHEDULE
Reported component ID
5724R46SE
Reported release
767
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt / Xsystem
Submitted date
2019-05-11
Closed date
2019-05-13
Last modified date
2019-05-13
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Modules/Macros
MAXIMO
Fix information
Fixed component name
MAXIMO SCHEDULE
Fixed component ID
5724R46SE
Applicable component levels
[{"Business Unit":{"code":"BU059","label":"IBM Software w\/o TPS"},"Product":{"code":"SS9NUN","label":"Maximo Asset Management Scheduler"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"767","Edition":"","Line of Business":{"code":"LOB59","label":"Sustainability Software"}}]
Document Information
Modified date:
13 May 2019