APAR status
Closed as fixed if next.
Error description
PROBLEM DESCRIPTION: Spatial Optimisation missing opportunities for alignment and travel time reduction STEPS TO REPRODUCE: 1) Go to Graphical Assignment application and create a new work list: - Populate the required fields -Enter a Work Query to bring up work orders that need to be assigned to a particular craft - e.g. EXISTS (SELECT 1 FROM ASSIGNMENT WHERE ASSIGNMENT.WONUM = WORKORDER.WONUM AND CRAFT = 'RANGER') -Enter a Labor Query to filter for labor records - Save the record 2) Select "Create Spatial Scheduling Scenario" action and enter a name. Click OK 3) Select "Run Optimization" action to create a spatial scheduling Optimzation 4) Go to "Constraints" tab and select "Include Travel Time in Total Time" checkbox. Do NOT select any other checkboxes 5) Go to Variables tab and enter a small window times e.g. Priority Direction = Ascending Travel Time Buffer % = 5 Resolution Minutes = 5 Assign Time Buffer Minutes = 10 6) Click Submit button RESULTS: Labor resources are traveling the whole geography and scheduling have not been optimized. e.g. The first labor have been assigned work for only half a day. The second labor is traveling out and back to do one of the jobs out in the distance EXPECTED RESULTS: Optimisation engine should align the work orders to cut the travel time REPORTED IN VERSION IBM Maximo Asset Management 7.6.0.9 IBM Decision Optimization Center 3.9 IBM Maximo Asset Management Scheduler Plus 7.6.7.0
Local fix
Problem summary
**************************************************************** * USERS AFFECTED: * * Users of the Graphical Assignment application in Scheduler * * 7.6.7 * **************************************************************** * PROBLEM DESCRIPTION: * * SPATIAL OPTIMISATION MISSING OPPORTUNITIES FOR ALIGNMENT * **************************************************************** * RECOMMENDATION: * ****************************************************************
Problem conclusion
Temporary fix
Comments
APAR Information
APAR number
IJ14767
Reported component name
MAXIMO SCHEDULE
Reported component ID
5724R46SE
Reported release
767
Status
CLOSED FIN
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt / Xsystem
Submitted date
2019-03-16
Closed date
2019-06-11
Last modified date
2019-06-11
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Modules/Macros
MAXIMO
Fix information
Applicable component levels
[{"Business Unit":{"code":"BU059","label":"IBM Software w\/o TPS"},"Product":{"code":"SS9NUN","label":"Maximo Asset Management Scheduler"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"767","Edition":"","Line of Business":{"code":"LOB59","label":"Sustainability Software"}}]
Document Information
Modified date:
11 June 2019