APAR status
Closed as program error.
Error description
App Server IBM WebSphere Application Server 8.5.5.9 Version Tivoli's process automation engine 7.6.0.9-IFIX20180314-1711 Build 20171127-0100 DB Build V7609-45 HFDB Build HF7609-03IBM TPAE Integration Framework 7.6.0.9 Build 20171127-2330 DB Build V7609-32IBM Maximo Asset Management Scheduler Plus 7.6.7.0 Build 20171127-0100 DB Build V7670-01IBM Maximo Asset Management Scheduler 7.6.7.0 Build 20171127-0100 DB Build V7670-56 HFDB Build HF7670-10IBM Maximo Asset Management Work Centers 7.6.0.3 Build 20171121-0723 DB Build V7603-175 Server OS Windows Server 2012 R2 6.3 Server DB DB2/NT64 10.5 (SQL10058) (c) Copyright IBM Corp. 2017 PROBLEM: GSLP - CPM is not calculating Early Start, Early Finish, Late Start, Late Finish and Float Pre Conditions - Create some Work with Resources need and dependency between the records - Create a Schedule at the Graphical Scheduling Large Project that bring those work orders Steps to Reproduce 1-) Go to the Graphical Scheduling - Large Projects 2-) Move to the Graphical View 3-) lick at the CPM button PROBLEM: CPM is not calculating Early Start, Early Finish, Late Start, Late Finish and Float EXPECT RESULT: As it is working over the GS it should be able to perform the calculation.
Local fix
N/A
Problem summary
**************************************************************** * USERS AFFECTED: * * Users of the Graphical Scheduling Large Projects. * **************************************************************** * PROBLEM DESCRIPTION: * * CPM IS NOT CALCULATING EARLY START, EARLYFINISH, LATE START, * * LATE FINISH AND FLOAT * **************************************************************** * RECOMMENDATION: * ****************************************************************
Problem conclusion
A code fix has been delivered.
Temporary fix
Comments
APAR Information
APAR number
IJ05362
Reported component name
MAXIMO SCHEDULE
Reported component ID
5724R46SE
Reported release
767
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt / Xsystem
Submitted date
2018-03-29
Closed date
2018-04-12
Last modified date
2018-04-12
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Modules/Macros
MAXIMO
Fix information
Fixed component name
MAXIMO SCHEDULE
Fixed component ID
5724R46SE
Applicable component levels
R767 PSY
UP
[{"Business Unit":{"code":"BU059","label":"IBM Software w\/o TPS"},"Product":{"code":"SS9NUN","label":"Maximo Asset Management Scheduler"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"767","Edition":"","Line of Business":{"code":"LOB59","label":"Sustainability Software"}}]
Document Information
Modified date:
12 April 2018