APAR status
Closed as program error.
Error description
PROBLEM: The Critical Path color is getting overright the % complete green color App Server IBM WebSphere Application Server 8.5.5.9 Version Tivoli's process automation engine 7.6.0.9 Build 20171122-0309 DB Build V7609-45IBM TPAE Integration Framework 7.6.1.0 Build 20171121-2330 DB Build V7610-03IBM Maximo Asset Management Scheduler Plus 7.6.7.0 Build 20171122-0309 DB Build V7670-01IBM Maximo Asset Management Scheduler 7.6.7.0 Build 20171122-0309 DB Build V7670-56IBM Maximo Asset Management Work Centers 7.6.0.3 Build 20171121-0723 DB Build V7603-175 Server OS Windows Server 2012 R2 6.3 Server DB DB2/NT64 10.5 (SQL10058) (c) Copyright IBM Corp. 2017 Pre Conditions - Create some Work that has predecessor it other - Create a Schedule at the Graphical Scheduling application that bring those work orders Steps to Reproduce 1-) Go to the Graphical Scheduling application 2-) Open you project and move to the More Information tab 3-) At the Percent Complete change from NONE to Physical 4-) Click at Graphical View tab and click select column - add the Physical % complete column 5-) Scroll to the Physical column and Set some Work Order to 100 6-) Under the More actions menu run the Calculate % complete 7-) After it back you should get the Work Order complete Bar as Green 8-) Now click at the Critical Path button at toolbar PROBLEM: The work that was green get override by the Critical Path color EXPECT RESULT: We should not lose the % complete color
Local fix
N/A
Problem summary
**************************************************************** * USERS AFFECTED: * * Users of the Graphical Scheduling application. * **************************************************************** * PROBLEM DESCRIPTION: * * % COMPLETE COLORING IS NOT WORKING PROPERLYFOR CRITICAL PATH * * BARS * **************************************************************** * RECOMMENDATION: * ****************************************************************
Problem conclusion
A code fix has been delivered.
Temporary fix
Comments
APAR Information
APAR number
IJ04256
Reported component name
MAXIMO SCHEDULE
Reported component ID
5724R46SE
Reported release
767
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt / Xsystem
Submitted date
2018-02-19
Closed date
2018-04-29
Last modified date
2018-04-29
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Modules/Macros
MAXIMO
Fix information
Fixed component name
MAXIMO SCHEDULE
Fixed component ID
5724R46SE
Applicable component levels
R767 PSY
UP
[{"Business Unit":{"code":"BU059","label":"IBM Software w\/o TPS"},"Product":{"code":"SS9NUN","label":"Maximo Asset Management Scheduler"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"767","Edition":"","Line of Business":{"code":"LOB59","label":"Sustainability Software"}}]
Document Information
Modified date:
29 April 2018