Installing the frame tie-down kit

This procedure describes how to install a frame tie-down kit and floor tie-down hardware.

The following procedures describe how to install a frame tie-down kit and floor tie-down hardware to secure an IBM® rack to a concrete floor beneath a 228.6 - 330.2 mm (9 -13 in. depth) or a 304.8 - 558.8 mm (12 - 22 in. depth) raised-floor environment or to a nonraised floor.