The disk drive module Power-on Self-Tests (POSTs) start each time that the module is switched on, or when a Send Diagnostic command is received. They check whether the disk drive module is working correctly. The POSTs also help verify a repair after a Field Replaceable Unit (FRU) has been exchanged.
The tests are POST-1 and POST-2.
If POST-1 completes successfully, POST-2 is enabled.
If POST-1 fails, the disk drive module is not configured into the system.
If POST-2 completes successfully, the disk drive module is ready for use with the system.
If POST-2 fails, the disk drive module is not configured into the system.