Powering Up the Switch
About this task
This section provides instructions for powering up the switch and verifying component installation.
CAUTION:
During this procedure, wear grounding wrist straps to avoid ESD damage to the
switch.
Note: Do not connect the MGMT ETH0 port to the LAN until the initial switch configuration has been
performed through the console connection. For instructions on connecting this port, see the Connecting the Management Port section.
To power up the switch and verify hardware operation, follow these steps: