A preventive maintenance (PM) schedule is contained within
a job plan and is associated with a request classification. The PM
schedule takes business rules and information from the job plan, the
request classification, and the associated service plan.
Before you begin
A job plan must
exist to contain the PM schedule.
Procedure
- Select the Maintenance menu item.
- In the Related Links - Maintenance section, select .
- Click the name of the job plan whose assets, locations,
or building system require scheduled maintenance.
- On the General tab, select the PM
Schedules tab.
- Click the Add action.
- In the Detail section, select a request class.
- Specify whether your PM type is schedule-based or reading-based,
and then take the related actions:
- If your PM type is schedule-based, click Create
Recurring Pattern and enter the recurring pattern details.
- If your PM type is reading-based, specify the reading action
rules and the reading occurrence details.
- In the Service Level Defaults section, define the time
within which a response, follow-up, and completion are required.
- In the Estimates section, specify how the work time and
cost estimates are obtained.
- On the Procedure tab, find the procedures
to be added to the tasks generated by the schedule.
- Click Create Draft.
- Click Activate.