Migrating a virtual machine from a P6 host fails
Migrating a virtual machine from a P6 host is not supported in these situations.
- A virtual machine on a NovaLink in P6 or P6+ mode cannot be migrated to an HMC managed P6 host.
- If a virtual machine on a NovaLink in P6 or P6+ mode is migrated to an HMC managed P7 host, that virtual machine cannot then be migrated to an HMC managed P6 host.
- If a virtual machine on an HMC managed P6 host is migrated to NovaLink and then has a NIC attached, that virtual machine cannot be migrated to an HMC managed P6 host.