Cabling for 9080-MHE and 9119-MHE with four system nodes
Use this information to cable the 9080-MHE and 9119-MHE with four system nodes in the configuration. (Model 9080-MME and 9119-MME cannot be cabled with four system nodes.)
When you cable the 9080-MHE and 9119-MHE with four system nodes in the configuration, you must connect the system nodes to each other, and you must connect each system node to the system control unit.
The following indexed diagrams help you understand port-to-port cabling between components in a configuration that has four system nodes. Use these diagrams with the tables that follow. To avoid connection issues, use the specified length of cable for each connection.
Figure 1. Symmetric multiprocessing (SMP) cabling for
four system nodes (short cables)
Cable number | Cable type | From: (U-Loc) | To: (U-Loc) |
---|---|---|---|
1 | 1.25 m (4.1 ft) SMP cable | U1: P1-T3 | U2: P1-T1 |
2 | 1.25 m (4.1 ft) SMP cable | U4: P1-T1 | U5: P1-T3 |
3 | 1.25 m (4.1 ft) SMP cable | U2: P1-T2 | U4: P1-T2 |
4 | 1.25 m (4.1 ft) SMP cable | U2: P1-T5 | U4: P1-T5 |
5 | 1.25 m (4.1 ft) SMP cable | U1: P1-T4 | U2: P1-T6 |
6 | 1.25 m (4.1 ft) SMP cable | U4: P1-T6 | U5: P1-T4 |
Notes:
|
Figure 2. Symmetric multiprocessing (SMP) cabling for four
system nodes (long cables)
Cable number | Cable type | From: (U-Loc) | To: (U-Loc) |
---|---|---|---|
1 | 1.5 m (4.9 ft) SMP cable | U1: P1-T2 | U5: P1-T2 |
2 | 1.5 m (4.9 ft) SMP cable | U1: P1-T1 | U4: P1-T3 |
3 | 1.5 m (4.9 ft) SMP cable | U2: P1-T3 | U5: P1-T1 |
4 | 1.5 m (4.9 ft) SMP cable | U2: P1-T4 | U5: P1-T6 |
5 | 1.5 m (4.9 ft) SMP cable | U1: P1-T6 | U4: P1-T4 |
6 | 1.5 m (4.9 ft) SMP cable | U1: P1-T5 | U5: P1-T5 |
Note: U2 is system node 1,
U4 is system node 2, U5 is system node 3, and U1 is system node 4.
|
Figure 3. System node 1 to system control unit cabling
Cable number | Cable type | From: (U-Loc) | To: (U-Loc) |
---|---|---|---|
1 | 1.0 m (3.28 ft) global flexible service processor (GFSP) cable | U2: P1-C9-T2 | U3: P1-C7-T2 |
2 | 0.33 m (1.08 ft) universal power interconnect (UPIC) cable | U2: P1-C9-T1 | U3: P1-C2-T1 |
3 | Clock flex cable (D1L) | U2: P1-T7 | U3: P1-C8-T2 |
4 | Clock flex cable (D1R) | U2: P1-T8 | U3: P1-C9-T1 |
5 | 0.33 m (1.08 ft) UPIC cable | U2: P1-C10-T1 | U3: P1-C5-T1 |
6 | 1.0 m (3.28 ft) GFSP cable | U2: P1-C10-T2 | U3: P1-C10-T2 |
Note: U2 is system node 1
and U3 is system control unit.
|
Figure 4. System node 2 to system control unit cabling
Cable number | Cable type | From: (U-Loc) | To: (U-Loc) |
---|---|---|---|
1 | 1.0 m (3.28 ft) UPIC cable | U4: P1-C9-T1 | U3: P1-C1-T1 |
2 | 1.0 m (3.28 ft) GFSP cable | U4: P1-C9-T2 | U3: P1-C7-T5 |
3 | Clock flex cable (D2L) | U4: P1-T7 | U3: P1-C8-T3 |
4 | Clock flex cable (D2R) | U4: P1-T8 | U3: P1-C9-T4 |
5 | 1.0 m (3.28 ft) UPIC cable | U4: P1-C10-T1 | U3: P1-C6-T1 |
6 | 1.0 m (3.28 ft) GFSP cable | U4: P1-C10-T2 | U3: P1-C10-T5 |
Note: U4 is system node 2
and U3 is system control unit.
|
Figure 5. System node 3 to system control unit cabling
Cable number | Cable type | From: (U-Loc) | To: (U-Loc) |
---|---|---|---|
1 | 1.0 m (3.28 ft) GFSP cable | U5: P1-C9-T2 | U3: P1-C7-T4 |
2 | Clock flex cable (D3L) | U5: P1-T7 | U3: P1-C8-T4 |
3 | Clock flex cable (D3R) | U5: P1-T8 | U3: P1-C9-T3 |
4 | 1.0 m (3.28 ft) GFSP cable | U5: P1-C10-T2 | U3: P1-C10-T4 |
Note: U5 is system node 3
and U3 is system control unit.
|
Figure 6. System node 4 to system control unit cabling
Cable number | Cable type | From: (U-Loc) | To: (U-Loc) |
---|---|---|---|
1 | 1.0 m (3.28 ft) GFSP cable | U1: P1-C9-T2 | U3: P1-C7-T1 |
2 | Clock flex cable (D4L) | U1: P1-T7 | U3: P1-C8-T1 |
3 | Clock flex cable (D4R) | U1: P1-T8 | U3: P1-C9-T2 |
4 | 1.0 m (3.28 ft) GFSP cable | U1: P1-C10-T2 | U3: P1-C10-T1 |
Note: U1 is system node 4
and U3 is system control unit.
|