Upgrading your Master Data Engine environment
from one major version to another major version (for example, 9.7
to 10.1)
often requires assistance from both members from your organization
and IBM® Services or an IBM consulting partner.
For information about applying IBM Initiate® Master Data Service maintenance releases and fix packs, refer to the MDM Initiate Maintenance Release Installation Instructions (PDF format).
Do not upgrade your implementation without first identifying the
team and relying on guidance from that team.
Do not upgrade your implementation without first identifying the
team and relying on guidance from that team.
After carefully reviewing the getting started topics, you are almost
ready to start the upgrade. Use this checklist to familiarize yourself
with the process. The upgrade tasks must be completed in the order
presented.
- Conduct the pre-upgrade tasks, including:
- Review upgrade considerations.
- Shut down any current Master Data Engine runtime
instances.
- Create backups of all operational data, including:
- Instance home directories on each engine host. This includes the
entire MAD_HOMEDIR directory
- Master Data Engine database
- Complete the 10.1 installation
worksheets.
- Engine installation worksheet
- Engine data source worksheet
- Engine instance worksheet
- Create the initial 10.1 Master Data Engine runtime
environment, including:
- Run the Master Data Engine installer.
- If you want to encrypt the database user password, use the madpwd2 or
the madpwd3 utilities. The madpwd2 utility
is a proprietary IBM Initiate encryption algorithm
that is meh quality, and does not require keys. The madpwd3 utility
offers full FIPS-compliant encryption that requires a valid key file.
- Create a Master Data Engine data
source.
- If applicable, create a stand-alone instance of the IBM Initiate LDAP
directory server.
- Create a Master Data Engine instance.
- Upgrade the Master Data Engine database
to version 10.1:
- Understand the database upgrade process.
- Complete the database upgrade worksheet.
- Run the database upgrade.
- Conduct the post-upgrade tasks, including:
- Start the 10.1 engine
instance.
- Confirm that the 10.1 engine
instance is started.
- Evaluate and conduct the next post-upgrade steps as applicable:
- Configure the initial 10.1 runtime
environment to communicate with an external corporate LDAP directory
server.
- Copy any custom environment variables and other settings created
before the upgrade into the initial 10.1 runtime
environment.
- Create additional 10.1 engine
instances or runtime environments to mimic the architecture implemented
before the upgrade.
- Work with IBM to verify
the upgrade and to re-derive data (re-dvd), re-generate weights, and
potentially adjust threshold.
Related concept
Interceptor tool
Planning your Master Data Engine installation