GDDM/MVS V3R2 Program Directory
Previous topic | Next topic | Contents | Contact z/OS | Library | PDF | BOOK


Testing the telecommunication network

GDDM/MVS V3R2 Program Directory
GC33-1801-01



This is how to test that you have established the telecommunication network successfully:

  1. Try running GDDM on all the types of terminals and different types of connections that you intend using with GDDM at your enterprise.
    
    
  2. Ensure that terminals you do not test are set up in the same way as terminals of the same type that have been tested successfully.
    
    

You have now completed the tests for the GDDM licensed programs you have installed under the TSO subsystem. Continue reading at "What to do if any of the installation tests fail" in topic 8.3.

Go to the previous page Go to the next page



Copyright IBM Corporation 1990, 2012