Change and configuration management BIRT report descriptions

The change and configuration management application includes BIRT-based report resources that are designed to provide information on change management, SCM, builds, and agile planning. You can customize them using BIRT.

Dashboard versions of reports

Some of the reports have dashboard versions, labeled "Micro" (Table 2), that are optimized for display on dashboards, given that screen real estate is limited. These micro reports are substituted for the parent reports when you add the report widget from the Change and Configuration Management category to your dashboard.

How reports are used in projects

If you use an existing process template (e.g. Scrum or Open Up) to create a new project area, many of the BIRT-based report resources are automatically deployed to the new project areas created with the process templates. If you are creating a unique process template, or if you want to add templates to your project area that were not automatically included, you can us any of the templates that are included with your installation.

Each report resource has a unique report ID, which is referenced from other interface elements such as report widgets in the dashboard and the Charts page in the Agile Planning editor. If the IDs referenced in the report widgets cannot be found, it is not possible to drill down. The BIRT-based report resource files can be found on the file system with the client installation, in the com.ibm.team.examples.reports.common folder. If you use the IBM Installation Manager to install the client, this folder is located in the Installation Manager shared files directory.

Available BIRT-based reports resources

The BIRT-based reports are interactive reports and include graphical elements that you can click to reveal additional data.

Note:
  • When you preview reports in the BIRT designer, the number of rows displayed is limited to 1,000. To see the complete list, you must deploy the report to the server.
  • If you want to view report data that is outside of a specific team area or iteration, those reports that include the parameters, Team Area and Iteration, must be modified. Clear My Team Areas or Current Iteration, respectively, to include all data.
Note: To use updated report resources after you upgrade IBM Engineering Workflow Management, you must deploy the report resources to your existing projects. For more information, see Deploying new report resources.
Important: If you change the work item category mapping after work items are created, these work items do not display correctly in reports. The issue occurs because the Team Area field is a computed field rather than a field where you enter or select a value. There is no time-stamp entry in the work item history for the category mapping change. To work around the issue, create a query that selects all of the work items that were created under the original category mapping. Then, perform a bulk edit to update the work items so that the work items are saved and the history shows an updated time stamp. When you perform the bulk edit, you might decide to change the Filed Against field to match the category that the team area is now mapped to. Or, if you are satisfied with the new category and team area mapping, you can make a minor change such as adding a comment or changing a tag.
Table 1. Change and configuration management BIRT-based report resources
Report name DW/Live/Both Output format Parameters Resources Description
Actual as percentage of estimated work DW Graph Team Area, Timeline, Iteration Work Items Distribution bar graph showing how close actual work was to estimated work
Advanced release burndown Both Graph Team Area, Timeline, Iteration, Type Work Items Overlaid bar/line graph indicating remaining work in story points, over time, for a release
Advanced release burnup Both Graph Team Area, Timeline, Iteration, Type, Priority Work Items Overlaid bar/line graph indicating work done in story points, over time, for a release
Advanced team velocity DW Graph Team Area, Timeline, Iteration Work Items Bar chart showing the achieved and the total story points grouped by iteration. Each bar represents one iteration, and the height of the bar represents the sum of all story points represented by work items targeted for that iteration
Asynch task counters DW Graph Service Method, Duration Repository Bar chart showing metrics on asynchronous server tasks
Average cycle time DW Graph Team Area, Category, Timeline, Iteration, Severity, Tags Work Items Line graph showing the average amount of time from when a work item is in progress to when it is resolved
Average lead time DW Graph Team Area, Category, Timeline, Iteration, Severity, Tags Work Items Line graph showing the average amount of time that work items stay in the unresolved state (from created to resolved)
Average time in state DW Graph Team Area, Category, Timeline, Iteration, Type, Severity, Tags Work Items Bar graph showing the average time work items spend in a particular state
Blocking work items DW Graph Team Area, Category, Timeline, Iteration Work Items Line graph indicating number of open blocking work items over time
Build health DW Graph Team Area, Build Definition, Duration, Include Incomplete Builds Build Results, JUnit Test Results Bar graph of build duration over time. Line graph of number of JUnit tests over time, overlaid on green/red-filled segments indicating build success or failure
Build results DW Table Project Area, Team Area, Build Definition, Build Label Build Results Table displaying information about a single specified build result
Burndown Both Graph Team Area, Category, Timeline, Iteration, Type, Severity, Priority, Week Days, Details, Tags, Offset Work Items "Sprint Burndown" indicating amount of remaining estimated work (in hours) over time, as well as total work over time
Burndown by story points DW Graph Team Area, Timeline, Iteration Work Items Line graph showing the remaining story points
Burnup Both Graph Team Area, Category, Timeline, Iteration, Type, Severity, Priority, Week Days, Details, Tags, Offset Work Items, Team Capacity "Sprint Burnup" indicating amount of completed work (in hours) over time, compared with total work and team capacity
Burnup by story points DW Graph Team Area, Timeline, Iteration Work Items Line graph showing the completed story points
Cycle time as percentage of lead time DW Graph Team Area, Category, Timeline, Iteration, Severity, Tags Work Items Line graph showing the amount of time from when a work item is activated (in progress) to when it is resolved
Closed work items by iteration DW Graph Project Area, Team Area, Iteration Work Items Bar graph showing number of closed work items, one bar per iteration
Closed work items daily DW Graph Team Area, Category, Timeline, Iteration, Type, Severity Work Items Bar graph showing number of work items being closed, one bar per day
Code health DW Graph Team Area, Build Definition, Component, Duration, Include Incomplete Builds Build Results, JUnit Test Results, Compilation Results Line graph of JUnit test failures over time, line graph of compiler warnings over time
Cumulative value flow by state DW Graph Team Area, Category, Timeline, Iteration, Type, Severity, State Group Category, State, and Tags Work Items Line graph of all work items over time, broken down by state. Each state has one colored area
Data warehouse metrics DW Graph Snapshot, Table, Start Date Data Warehouse Metadata about the Rational® Team Concert® 2.0 data mart, indicating footprint and number of rows
Defect backlog DW Graph From, To, Team Area Work Items Line graph indicating number of open defects over time
Defect backlog by project area DW Graph Project Area, Duration Work Items Line graph indicating number of open defect over time in a project area
Defect discovery rate DW Graph From, To, Team Area Work Items Line graph indicating number of work items opened (created) over time, one data point per week
Deferred work items DW Graph Team Area, Category, Timeline, Iteration Work Items Line graph indicating number of work items whose "planned for" iteration changed, over time. One data point per day
Estimate changes DW Table Team Area, Iteration, From, To, Show Zero Estimates Work Items Table showing work items whose estimate was changed during the specified time interval (one row per work item)
Estimated vs actual work DW Graph Team Area, Timeline, Iteration Work Items Line graph showing accuracy of work item estimates as a ratio of estimate/time spent, over time
Frequent test failures DW Table Team Area, Build Definition, Component, Duration Build Results, JUnit Test Results Table indicating top ten frequent JUnit failures, one row per JUnit test
Frequent test regressions DW Table Team Area, Build Definition, Component, Duration Build Results, JUnit Test Results Table indicating top ten frequent JUnit regressions, one row per JUnit test
Latest repository metrics DW Graph Namespace Repository Bar graphs indicating item count, state count, and footprint of artifacts in the Jazz® repository
Latest repository metrics by namespace DW Graph Namespace, Item Type Repository Bar graphs indicating footprint, item count, and state count of artifacts in the Jazz repository, broken down by namespace
New work items by severity DW Graph Team Area, Category, Timeline, Iteration, Type, Severity Work Items Bar graph of new (created) work items, one bar per day, stacked by severity
Open work items DW Graph Team Area, Category, Timeline, Iteration, Type, Severity Work Items Line graph plotting all open work items over time
Open vs Closed story points by iteration DW Graph Team Area, Timeline, Iteration Work Items Bar graph of open, in progress, and closed story points
Open vs Closed work items DW Graph Team Area, Category, Timeline, Iteration, Severity, Type, Tags Work Items Multiple line graph indicating number of work items over time, one line for open work items, one line for closed work items
Open work items by type DW Graph Team Area, Category, Timeline, Iteration, Type Work Items Multiple line graph indicating number of open work items over time, one line for each work item type
Personal timesheet DW Table Project Area, User, From, To Work Items Table displaying totals per user and time code.
Personal timesheet with project members DW Table Project Area, User, From, To Work items Table displaying totals per user and time code. The list of project areas are built based on the project areas that the current user or creator of the report have project area membership to. Users are shown who have project area membership to the selected project areas.
Personal timesheet with project members by ProjectArea DW Table Project Area, User, From, To Work items Table displaying details per work item for selected users of the current project area. The list of project areas are built based on the project areas that the current user or creator of the report have project area membership to. Users are shown whom have project area membership to the selected project areas.
Personal timesheet with team members DW Table Project Area, User, From, To Work items Table displaying totals per user and time code. The list of project areas are built based on the project areas that the current user or creator of the report has team area membership to at least one team area in the project area. Users are shown who have team area membership for the selected project areas.
Personal timesheet with team members by ProjectArea DW Table Project Area, User, From, To Work items Table displaying details per work item for selected users of the current project area. The list of project areas are built based on the project areas that the current user or creator of the report has team area membership to at least one team area in the project area.
Personal timesheet by project area DW Table Project Area, User, From, To Work Items Table displaying totals for selected users in a project area.
Personal timesheet by work item DW Table Category, Timeline, Iteration, User, From, To Work Items Table displaying details per work item for selected users of the current project area.
Process control DW Chart Team Area, Category, Timeline, Iteration, Severity, Tags Work Items Chart showing the time a work item is unresolved, from its creation to its resolution
Project activity DW Graph Project Area, Team Area, Stream, Component Streams, Change Sets Two bar graphs indicating number of change sets added/removed/modified in a stream over time, and number of file modifications/additions/deletions in a stream over time. One bar per day
Project activity by component DW Graph Team Area, Stream, Component, Duration Streams, Change Sets Two bar graphs indicating number of change sets added/removed/modified in a stream over time, and number of file modifications/additions/deletions in a stream over time. One bar per day, broken down by component
Release burndown Both Graph Team Area, Timeline, Iteration Work Items Line graph indicating number of total story points remaining for the release, one data point for each iteration measured at the start of that iteration
Repository integral range counters DW Graph Group, Name, Facet Repository Two line graphs indicating over-time information about repository counters. Total time, min/max/average time, and standard deviation
Repository metrics DW Graph Namespace, Start Date Repository Line graphs indicating item count, state count, and footprint of artifacts in the Jazz repository over time
Repository metrics by namespace DW Graph Namespace, Start Date Repository Line graphs indicating item count, state count, and footprint of artifacts in the Jazz repository over time, broken down by namespace
Repository range counters DW Graph Group, Name, Facet Repository Three line graphs indicating over-time information about repository counters. Total time, min/max/average time, and standard deviation
Repository scalar counters DW Graph Group, Name, Facet Repository Two line graphs indicating over-time information about repository counters. Total time, and min/max time
Service call counters DW Graph Service Method, Duration Repository Four bar graphs indicating over-time information about execution of the specified Jazz service calls. Count, Average Elapsed Time, Maximum Elapsed Time, and Minimum Elapsed Time, one bar per day
Story child work items Live Table Project Area, Team Area, Story Work Items, Change Sets Table showing child work items of a selected story, with details about change sets linked to the work item, one row per work item
Story points DW Graph Team Area, Timeline, Iteration Work Items Stacked area graph indicating number of story points overtime, one series for remaining story points, one series for achieved story points
Story points by iteration DW Graph Team Area, Timeline, Iteration Work Items Bar graph indicating total number of story points allocated to each iteration, one bar per iteration
Story points progress DW Graph Team Area, Timeline, Iteration Work Items Bar graph that shows the progress of story points by team area. Each bar represents one team, and the segments within the bar represent the proportion of open, in progress, and completed story points
Story points remaining DW Graph Team Area, Timeline, Iteration Work Items Line graph indicating number of remaining story points over time
Stream size counts DW Graph Project Area, Team Area, Stream, Component, Start Streams Line graphs and bar graphs indicating size of a stream in the database
Team capacity DW Graph Timeline, Team Area, From, To Team Capacity Line graph indicating total capacity of a team based on allocated resources, over time
Team timesheet DW Table Category, Timeline, Iteration, From, To Work Items Table displaying totals per user and work items for the current project area.
Team velocity DW Graph Team Area, Timeline, Iteration Work Items Bar graph indicating number of achieved story points allocated to each iteration, one bar per iteration
Team velocity by team DW Graph Project Area, Team Area, Iteration Work Items Multiple line graph indicating number of achieved story points allocated to each iteration. One data point per iteration, one line per team area
Work item comments comparison DW Graph Project Area, Team Area, Iteration Work Items Multiple line graph indicating work item comment activity over time, one line per team area
Work item comparison DW Graph Team Areas, Timeline, Iteration Work Items Multiple line graph indicating number of open work items over time, one line per team area
Work item comparison by project area DW Graph Project Area, Type, Duration Work Items Multiple line graph indicating number of open work items for one or more project areas over time, one line per project area
Work item timesheet summary DW Table Work Item ID, Depth, From, To Work Items Table displaying a summary of totals by work item (and its children) and time code. The "depth" parameter determines the number of levels.
Work items by owner Live Graph Team Area, Owner, Type Work Items Bar graph indicating number of work items, one bar per owner. Bars broken down by work item type or state (open/closed)
Work items by priority DW Graph Team Area, Category, Timeline, Iteration, Priority Work Items Multiple line graph indicating number of work items over time, one line per work item priority. Two graphs: one for open, one for closed
Work items by team area Live Graph Team Area, Type Work Items Bar graph indicating number of work items, one bar per team area. Bars broken down by work item type or state (open/closed)
Work items daily activity Live Graph Project Area, Team Area, Category, Iteration, Type, Severity Work Items Bar graphs indicating work item activity in terms of number of subscriptions and number of comments, over time. One bar per day, broken down by work item severity

Table 2. Micro report resources
Report name DW/Live/Both Output format Parameters Resources Description
Micro Advanced Release Burndown Both Graph Project Area, Team Area, Timeline, Iteration, Type Work Items Overlaid Bar/line graph indicating remaining work in story points, over time, for a release
Micro Advanced Release Burnup Both Graph Team Area, Timeline, Iteration, Type Work Items Overlaid Bar/line graph indicating work done in story points, over time, for a release
Micro Advanced Team Velocity DW Graph Team Area, Timeline, Iteration Work Items Bar chart showing the achieved and the total story points grouped by iteration. Each bar represents one iteration, and the height of the bar represents the sum of all story points represented by work items targeted for that iteration
Micro Average Cycle Time DW Graph Team Area, Category, Timeline, Iteration, Severity, Tags Work Items Line graph showing the of the average time work items stay in the active state
Micro Average Lead Time DW Graph Team Area, Category, Timeline, Iteration, Severity, Tags Work Items Line graph showing the average amount of time for a work item to be resolved
Micro Average Time in State DW Graph Team Area, Category, Timeline, Iteration, Type, Severity, Tags Work Items Bar graph showing the average time work items spend in a particular state
Micro Blocking Work Items DW Graph Project Area, Team Area, Category, Timeline, Iteration Work Items Line graph indicating number of open blocking work items over time
Micro Build Duration DW Graph Team Area, Build Definition, Duration, Include Incomplete Builds Build Results, JUnit Test Results Bar graph of build duration over time
Micro Build Health DW Graph Team Area, Build Definition, Duration, Include Incomplete Builds Build Results, JUnit Test Results Line graph of number of JUnit tests over time, overlaid on green/red-filled segments indicating build success or failure
Micro Burndown Both Graph Project Area, Team Area, Category, Timeline, Iteration, Type, Severity, Priority, Week Days, Details, Tags, Offset Work Items "Sprint Burndown" indicating amount of remaining estimated work (in hours) over time, as well as total work over time
Micro Burndown by Story Points DW Graph Team Area, Timeline, Iteration Work Items Line graph showing the remaining story points
Micro Burnup Both Graph Project Area, Team Area, Category, Timeline, Iteration, Type, Severity, Priority, Week Days, Details, Tags, Offset Work Items, Team Capacity "Sprint Burnup" indicating amount of completed work (in hours) over time, compared with total work and team capacity
Micro Burnup by Story Points DW Graph Team Area, Timeline, Iteration Work Items Line graph showing the completed story points
Micro Change Set Activity DW Graph Team Area, Stream, Component, Duration Streams, Change Sets Bar graph indicating number of change sets added/removed/modified in a stream over time. One bar per day
Micro Closed Work Items by Priority DW Graph Project Area, Team Area, Category, Iteration, Priority Work Items Multiple line graph indicating number of closed work items over time, one line per work item priority
Micro Closed Work Items Daily DW Graph Project Area, Team Area, Category, Timeline, Iteration, Severity Work Items Bar graph showing number of work items being closed, one bar per day
Micro Compiler Warnings DW Graph Team Area, Build Definition, Component, Duration, Include Incomplete Builds Build Results, JUnit Test Results, Compilation Results Line graph of compiler warnings over time
Micro Cumulative Value Flow by State Live Graph Team Area, Category, Timeline, Iteration, Type, Severity, State Group Category, State, and Tags Work Items Line graph of all work items over time, broken down by state. Each state has one colored area.
Micro Cycle Time as Percentage of Unresolved Time DW Graph Team Area, Category, Timeline, Iteration, Severity, Tags Work Items Line graph showing the amount of time from when a work item is activated (for example, its state is set to "in progress") to when it is resolved
Micro Deferred Work Items DW Graph Project Area, Team Area, Category, Timeline, Iteration Work Items Line graph indicating number of work items whose "planned for" iteration changed, over time. One data point per day
Micro Estimated vs Actual Work DW Graph Project Area, Team Area, Timeline, Iteration Work Items Line graph showing accuracy of work item estimates as a ratio of estimate/time spent, over time
Micro File Change Activity DW Graph Team Area, Stream, Component, Duration Streams, Change Sets Bar graphs indicating number of file modifications/additions/deletions in a stream over time. One bar per day
Micro Frequent Test Failures DW Table Team Area, Build Definition, Component, Duration Build Results, JUnit Test Results Table indicating top ten frequent JUnit failures, one row per JUnit test
Micro Frequent Test Regressions DW Table Team Area, Build Definition, Component, Duration Build Results, JUnit Test Results Table indicating top ten frequent JUnit regressions, one row per JUnit test
Micro Test Failures DW Graph Team Area, Build Definition, Component, Duration, Include Incomplete Builds Build Results, JUnit Test Results Line graph indicating number of unit test failures over time
Micro Number of Tests DW Graph Team Area, Build Definition, Component, Duration, Include Incomplete Builds Build Results, JUnit Test Results Line graph indicating total number of unit tests over time
Micro New Work Items by Severity DW Graph Project Area, Team Area, Category, Timeline, Iteration, Type, Severity Work Items Bar graph of new (created) work items, one bar per day, stacked by severity
Micro Open vs Closed Work Items DW Graph Project Area, Team Area, Category, Timeline, Iteration, Type, Severity, Tags Work Items Multiple line graph indicating number of work items over time, one line for open work items, one line for closed work items
Micro Open Work Items by Priority DW Graph Project Area, Team Area, Category, Timeline, Iteration Work Items Multiple line graph indicating number of open work items over time, one line per work item priority
Micro Open Work Items by Type DW Graph Project Area, Team Area, Category, Timeline, Iteration, Type Work Items Multiple line graph indicating number of open work items over time, one line for each work item type
Micro Process Control DW Chart Team Area, Category, Timeline, Iteration, Severity, Tags Work Items Chart showing the time a work item is unresolved, from its creation to its resolution
Micro Release Burndown Both Graph Project Area, Team Area, Timeline, Iteration Work Items Line graph indicating number of total story points remaining for the release, one data point for each iteration measured at the start of that iteration
Micro Story Points DW Graph Project Area, Team Area, Timeline, Iteration Work Items Stacked area graph indicating number of story points overtime, one series for remaining story points, one series for achieved story points
Micro Story Points by Iteration DW Graph Project Area, Team Area, Iteration Work Items Bar graph indicating total number of story points allocated to each iteration, one bar per iteration
Micro Story Points Remaining DW Graph Project Area, Team Area, Timeline, Iteration Work Items Line graph indicating number of remaining story points over time
Micro Team Velocity DW Graph Project Area, Team Area, Timeline, Iteration Work Items Bar graph indicating number of achieved story points allocated to each iteration, one bar per iteration
Micro Timelines DW Table Project Area, Team Area Project/Team Table displaying the timeline and iterations associated with the current iteration of a specific project or team area.
Micro Work Item Comparison DW Graph Team Areas, Timeline, Iteration Work Items Multiple line graph indicating number of open work items over time, one line per team area