Power cabling

IBM lab based services is responsible for connecting the building block power cables.

The following table shows the cabling diagram for cabling power for 60A feeds.

Note: This illustration is provided to show the power cabling for the PDUs. It does not represent the particular racking order for the devices in the rack, or the exact configuration of devices installed in the rack.
Figure 1. Power cabling diagram
Power cabling diagram

The scalable building block is configured with four PDUs if 60A feeds are used.

Table 1 shows the internal cabling connections between the four PDUs and the power supplies (PSs) in the scalable building block components.

The cabling diagram uses the following abbreviations for the components to be cabled:

Table 1. Wiring diagram for a scalable building block (BB) with four PDUs and 60A feeds
Left PDUs Current@200V Subsystem (left PS) Subsystem (right PS) Current@200V Right PDUs Comment
Upper left PDU         Upper right PDU  
PW::PD1:::P01 1A (customer KVM) (customer KVM) 1A PW::PD2:::P01  
PW::PD1:::P02 1A PW::FC:SW1:::P1 PW::FC:SW1:::P2 1A PW::PD2:::P02 1st Fibre Channel (FC) switch
PW::PD1:::P03 1A PW::FC:SW2:::P1 PW::FC:SW2:::P2 1A PW::PD2:::P03 2nd FC switch
PW::PD1:::P04 4A PW::EXP4:S1:P1 PW::EXP4:S1:P2 4A PW::PD2:::P04 4th additional AE2
PW::PD1:::P05 1A PW:FC:SW3:::P1 PW:FC:SW3:::P2 1A PW::PD2:::P05 3rd FC switch
PW::PD1:::P06 4A PW::EXP3:S1:P1 PW::EXP3:S1:P2 4A PW::PD2:::P06 3rd additional AE2
PW::PD1:::P07 4A PW::EXP2:S1:P1 PW::EXP2:S1:P2 4A PW::PD2:::P07 2nd additional AE2
PW::PD1:::P08 4A PW::EXP1:S1:P1 PW::EXP1:S1:P2 4A PW::PD2:::P08 1st additional AE2
PW::PD1:::P09 1A PW::FC:SW4:::P1 PW::FC:SW4:::P2 1A PW::PD2:::P09 4th FC switch
PW::PD1:::P10 4A PW::BB4:V1:S1:P1 PW::BB4:V1:S1:P2 4A PW::PD2:::P10 BB4 AC3
PW::PD1:::P11 4A PW::BB4:V2:S1:P1 PW::BB4:V2:S1:P2 4A PW::PD2:::P11 BB4 AC3
PW::PD1:::P12 4A PW::BB4:AE2:S1:P1 PW::BB4:AE2:S1:P2 4A PW::PD2:::P12 BB4 AE2
  32A Maximum current (left)   32A Maximum current (right) Worst case
Lower left PDU         Lower right PDU  
PW::PD3:::P01 - Not used Not used - PW::PD4:::P01 -
PW::PD3:::P02 4A PW::BB3 :V1:S1:P1 PW::BB3:V1:S1:P2 4A PW::PD4:::P02 BB3 AC3
PW::PD3:::P03 4A PW::BB3 :V2:S1:P1 PW::BB3:V2:S1:P2 4A PW::PD4:::P03 BB3 AC3
PW::PD3:::P04 4A W::BB3:AE2:S1:P1 W::BB3:AE2:S1:P2 4A PW::PD4:::P04 BB3 AE2
Note: If two 16 Gbps FC switches are used instead of four 8 Gbps FC switches, the cabling connections for switch 3 and switch 4 in Table 1 are not needed.