POWER7 information

SPNETWK

A connection between a management console and a service processor has been lost.

The location code will identify the unit to which contact was lost.

  1. Is the system receiving power?
    • No: Take the necessary action to restore power to the system. This ends the procedure.
    • Yes: Continue with the next step.
  2. Verify the network connection between the service processor and the management console. See the table below for location information.
    FRU name (check in order, one at a time) Location
    8202-E4B, 8202-E4C, 8202-E4D, 8205-E6B, 8205-E6C, 8205-E6D service processor to management console Ethernet cable Un-P1-T5 or Un-P1-T6
    8231-E2B, 8231-E1C, 8231-E1D, 8231-E2C, 8231-E2D, 8268-E1D service processor to management console Ethernet cable Un-P1-T3 or Un-P1-T4
    8233-E8B, 8236-E8C service processor to management console Ethernet cable Un-P1-T7
    8248-L4T, 8408-E8D, 9109-RMD service processor to management console Ethernet cable Un-P1-C1-T2
    8412-EAD, 9117-MMB, 9117-MMC, 9117-MMD, 9179-MHB, 9179-MHC, 9179-MHD service processor to management console Ethernet cable Un-P1-C1-T6
    9119-FHB HMC 1 to BPH A Un-P1-C4-J01
    9119-FHB BPH A to system controller 0 Un-P1-C4-J05 to Un-P1-C2-J4
    9119-FHB BPH A to system controller 1 Un-P1-C4-J06 to Un-P1-C5-J4
    9119-FHB HMC 2 to BPH B Un-P2-C4-J01
    9119-FHB BPH B to system controller 0 Un-P2-C4-J05 to Un-P1-C2-J3
    9119-FHB BPH B to system controller 1 Un-P2-C4-J06 to Un-P1-C5-J3
    9125-F2C HMC1 to DCCA 0 HMC1 to Un-P1-C147-T2
    9125-F2C HMC2 to DCCA 0 HMC2 to Un-P1-C147-T3
    9125-F2C HMC1 to DCCA 1 HMC1 to Un-P1-C148-T2
    9125-F2C HMC2 to DCCA 1 HMC2 to Un-P1-C148-T3
    9125-F2C HMC1 port 2 to BPH A HMC1 port 2 to Un-P2-C1-T19
    9125-F2C HMC2 port 2 to BPH A HMC2 port 2 to Un-P2-C1-T36
    9125-F2C HMC1 port 1 to BPH B HMC1 port 1 to Un-P1-C1-T19
    9125-F2C HMC1 port 2 to BPH B HMC1 port 2 to Un-P1-C1-T36
  3. Does the problem persist?
    • No: This ends the procedure.
    • Yes: Continue with the next step.
  4. Shut down the operating system for the server in preparation to reboot the server. Reapply the power and boot the server. Does the problem persist?
    • No: This ends the procedure.
    • Yes: Continue with the next step.
  5. Use SVCPROC to replace the service processor. If the problem persists, contact your next level of support. This ends the procedure.


Send feedback Rate this page

Last updated: Fri, May 18, 2018