This section describes the layout of the Cycle Count Variance Weekly Report.
The node for which the report is generated.
The date on which the count task begins.
The date on which the week ends along with the count task.
The number of locations for which the count task was performed.
The locations which showed variance.
The quantity defined with the Selling and Fulfillment Foundation.
The actual quantity counted by the user.
The difference between the system quantity and the count quantity.
The sum of absolute of variance quantity.
Even when the Variance Quantity is negative, the Absolute Variance Quantity is considered to be positive.
If System Quantity is zero than Variance percentage is 100.
If System Quantity is not zero than Variance percentage is calculated as follows:
Variance percentage = (Absolute Variance Quantity / System Quantity) x 100.
If Count Quantity is zero than Accuracy is 0.
If Count Quantity is not zero than Accuracy is calculated as follows:
Accuracy = (Count Quantity / System Quantity) x 100.
The product of the unit cost of the item and the absolute variance quantity.
The currency of Variance Value.
The Cycle Count Variance Weekly Report appears in portrait layout.