APAR status
Closed as documentation error.
Error description
When running backup or restore operations on Microsoft 365 an error can occur indicating that the connections have been throttled. The throttling shows up when Microsoft 365 is overloaded and cannot handle the required number of connections. The operations will be continued but the performance could be reduced. <CTGGR0016> {account name} - {feature name} - The task has been throttled by Microsoft 365 services. The agent must wait before continuing. This is common and should not be treated as an error. Documentation needs to highlight these messages are common and do not depend on the backup software. They are indeed dependent on M365 Exchange Web Service (EWS). IBM Spectrum Protect Plus Versions Affected: IBM Spectrum Protect Plus 10.1.5 and later Additional Keywords: SPP, SPPlus, TS009244253, Office 365, Microsoft, throttle
Local fix
Problem summary
**************************************************************** * USERS AFFECTED: * * IBM Spectrum Protect Plus level 10.1.5, 10.1.6, 10.1.7, * * 10.1.8, 10.1.9, 10.1.10, 10.1.11, and 10.1.12 * **************************************************************** * PROBLEM DESCRIPTION: * * See Error Description * **************************************************************** * RECOMMENDATION: * * This problem is currently projected to be fixed in IBM * * Spectrum Protect Plus 10.1.13. Note that this is subject to * * change at the discretion of IBM. * ****************************************************************
Problem conclusion
The following explanation of the message CTGGR0016 will be updated in the IBM Spectrum Protect Plus documentation: "Throttling is normal and is merely a result of M365 ensuring that it can keep the system healthy and fast for its users." See link: https://www.ibm.com/docs/en/spp/10.1.13?topic=messages-ctggr0003 #CTGGR0016
Temporary fix
Comments
APAR Information
APAR number
IT41392
Reported component name
SP PLUS
Reported component ID
5737SPLUS
Reported release
A15
Status
CLOSED DOC
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt / Xsystem
Submitted date
2022-06-30
Closed date
2022-11-17
Last modified date
2022-11-17
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Fix information
Applicable component levels
[{"Business Unit":{"code":"BU058","label":"IBM Infrastructure w\/TPS"},"Product":{"code":"SSNQFQ","label":"IBM Spectrum Protect Plus"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"A15","Line of Business":{"code":"LOB26","label":"Storage"}}]
Document Information
Modified date:
01 February 2024